Vinton Construction

STH 42 - Village of Sister Bay, Door County, Wisconsin

Sister Bay and Wisconsin Department of Transportation / Door County, Wisconsin

http://sacajaweaes.chalakseir.com/images/STH%2042%20Sister%20Bay/_projectHero/Finished-Roadway-42-57-intersection.JPG

Date Completed:

May 2016

Services:

Concrete Pavement, Earthwork & Grading, Underground Utilities

Construction Engineer:

REI Engineering

Award Won:

2017 / 28th Annual ACPA Excellence in Concrete Pavement Awards

Project Summary:

位于姊妹湾的STH 42既是一条“穿越”道路,也是一条“主要街道”,在这里,功能和美学同样重要.

Contract Amount:

$5,800,000

Project Length:

0.77 miles

By the Numbers:

  • 20,389 SY of 8-inch Concrete Pavement
  • 22,900 CY of Common Excavation
  • 4,800 CY of Rock Excavation
  • 13,720 Tons of Base Aggregate
  • 8,040 LF of Concrete Curb and Gutter
  • 40,953 SF of Concrete Sidewalk
  • 5,900 LF of Storm Sewer
  • 89 Sewer Structures
Sister-Bay-Aerial-Overview
Sister-Bay-Aerial
Finished-roadway-2
Finished-roadway
Finsihed-Roadway-11.5-grade
Integral-curb-and-gutter-and-in-pavement-structures
Rock-Excavation
Slipform-Paving

About the Project

沿着绿湾湾的海岸蜿蜒穿过门县的北半部, the WIS 42 corridor is, for the most part, a 2-lane highway connecting many heavy tourism-oriented communities.

它既是“穿越”道路,也是这些社区的“主要街道”,在这些社区中,功能和美学同样重要.

中国博彩网址沿线的许多企业在一年中的几个月里就能维持生计,因此, 在平衡这一点与完成道路工作的需要方面给予了极大的考虑. 为了容纳当地的商业社区和相应的大量旅游和季节性人口, construction was split into 8 separate stages, the first of which began in July 2015. Public outreach was a priority to keep the local Village & 城镇官员和企业被告知进展情况,包括每周更新和公共信息会议,以及与当地企业主的日常沟通.

整个中国博彩网址团队都来自于WisDOT优秀的设计、规划 & coordination with Village staff and local businesses, 18个不同的承包商,他们对自己的工作非常专注,对当地的生意也很敏感, 听取建设队的意见,与建设队密切合作,及时决策的村长, 建筑工程人员了解并适应城市重建的复杂性和需求. The project focused on safety enhancements, protection of the environment, minimizing future maintenance needs, and minimizing the disturbance to the local economy and tourism industry.

Simply put, this project defined what teamwork is all about. A true partnership was forged by WisDOT, the Village of Sister Bay, REI Engineering, Vinton Construction, and the business community do deliver a high quality concrete paving project. Through this synergy, 取得了一些成就,帮助中国博彩网址和社区以尽可能少的努力实现了一个成功的中国博彩网址, completing 2-lanes of concrete paving an amazing 163 days ahead of schedule.

这个中国博彩网址从构思到完成的每一个方面都是经过深思熟虑的, well executed, and a huge success. 姊妹湾村有一条经过改造的走廊,在未来的许多年里,这条走廊将为社区提供中国博彩平台,这要归功于各方的承诺,即提供一个具有美丽道路美学和便利设施的优质中国博彩平台中国博彩网址.

Noteworthy Project Details

  • 姐妹湾位于全年高度依赖旅游业的门县中心. 最初的中国博彩网址计划包括一个多年建设中国博彩网址的8个计划阶段,以适应该地区的各种旅游活动,并在2015年秋季和2016年春季进行混凝土铺路工作. 在不同的时间进行了许多更改或提高了效率,从而加快了中国博彩网址的速度,并使WIS 42的双向交通比计划提前了163天. The WisDOT, Village of Sister Bay, 和REI非常合作,并接受了几项涉及雨污水渠的中国博彩网址阶段修订建议, grading, rock excavation, and concrete paving.
  • Vinton提出了一项降低成本的激励措施(CRI),允许在中国博彩网址早期铺设HES永久性中国博彩平台,以取代临时沥青. 这一节约成本的机会包括在2A阶段取消一些临时沥青,并铺设高早强(HES)永久性中国博彩平台. 2015年秋季,Vinton再次加快了混凝土铺装速度,要求在部分工作中使用额外的HES混凝土,从而减少养护时间, which allowed for subsequent concrete work to be completed in 2015. 尽管合同要求WIS 42的一半在冬季关闭期间向北向车道开放, WIS 42的两条车道都是在2015年11月开通的,而不是合同要求的2016年5月.
  • Innovative construction included on site crushing of 14,000 tons of excavated rock and recycled asphalt thereby saving wear, tear, and congestion on local streets by reducing haul truck traffic. Although Vinton performed all concrete paving operations, 他们选择提供一个独立的分包商来协助完成大部分人行道工作,这有助于加快工作进度. 为了确保严格的中国博彩网址进度,使用了多名岩石爆破和雨水处理人员. 为了尽量减少路权的获取,需要对岩壁进行预裂,尽管预裂被证明是无效的, 中国博彩网址团队开发了一种独特的岩石装甲墙设计来完成预期的工作.
  • 为姊妹湾的游客提供便利是当地企业和乡村工作人员的首要任务. 由于STH 42只包括1条NB和1条SB车道,以及沿高速公路两侧平行的停车位和人行道,因此大部分工作必须在非常狭窄的区域完成,这使中国博彩网址的阶段变得复杂. 在旅游季节,每周有多达10万辆汽车通过该地区. 重点是在整个中国博彩网址中保持至少一条交通车道,以及通往38家企业的临时行人和车辆通道. Vinton不断寻求有效完成工作的方法,包括与姊妹湾村合作,改变绕行路线和街道封闭的时间和使用,以最好地适应工作流程,同时最大限度地减少对公众的不便.